Commercial solar on a roof you lease

The tenant has the motivation and none of the authority. The landlord has the reverse. Five things the lease has to settle before a design is worth drawing.

Most commercial solar enquiries that stall do not stall on the engineering. They stall because the person who wants the system cannot sign for it, and the person who can sign for it does not pay the power bill.

If you occupy a leased building. A warehouse, a retail strip, a club, an aged care facility, a church hall. The lease decides this project before anybody opens a design package. It is worth settling first, because it is cheaper to resolve in a conversation than in a variation.

The split that causes it

The tenant watches the energy cost every quarter and has every reason to want the array. The landlord owns the roof, carries the building insurance, and in most cases sees none of the saving. Neither party is being difficult. They are looking at two different balance sheets.

Everything below is really one question asked five ways: who holds what, and for how long?

Five things the lease has to settle

1. Who owns the system

A rooftop array is a fixture once it is installed. Whether it stays the tenant's asset, becomes the landlord's, or transfers at some point in the term is a decision, and if the lease is silent on it the decision gets made under pressure at the end of the term instead. Put it in writing while everybody is still friendly.

2. Who takes the benefit

Follow the electricity account, not the roof. Generation offsets consumption behind whichever meter the system is connected to, so in a multi-tenanted building the answer depends on how the site is metered and who is billed for what. In a single-tenant building with the tenant on the retail account, the tenant takes the benefit and the landlord gains an improved asset. Both of those are real, and they are worth naming separately.

3. How much lease is left

A solar array is a long-dated asset on a dated agreement. Remaining term against options to renew is the number that matters here, not the original lease length. Where the term is short, an assignment or buy-out mechanism written into the deal now is usually easier than renegotiating it later.

4. Make-good

Standard make-good wording asks the tenant to return the premises to the condition they took it in. Nobody writes that clause with a 300-panel array in mind. Get a specific carve-out. The system stays, the system transfers, or the system is removed at a defined cost, and get your own lawyer to write it. This is the clause that turns a good project into an argument three years later.

5. The roof itself

Age, remaining life, membrane or sheet warranty, and who is responsible for it under the lease. Mounting hardware on a roof with five years left in it is a sequencing problem, not a design problem, and it has an obvious answer if it is raised early enough. Penetrating a roof under warranty without the right sign-off can void it, and that is the landlord's exposure, not the tenant's.

Where Crown Solar starts

Not with a design. Every maintenance and performance agreement starts with a baseline audit, because we will not contract a performance commitment on an asset we have not tested. On a new build the same discipline applies in reverse. The site is measured before anything is proposed.

One other thing that belongs in the lease conversation. Monitoring portal accounts are created in the asset owner's name, with Crown Solar granted access. Not the reverse. Whoever owns the asset keeps the data and the history, including if they stop working with us. In a landlord–tenant arrangement that detail decides who can prove what the system did, which is exactly what you want settled in advance.

Scope, so you know whether this is the right conversation to be having: Crown Solar designs and installs from around 30 kW upwards, to multi-megawatt, rooftop and ground mount, across New South Wales and the ACT. We maintain systems from 5 kW to 5 MW, on all brands, including systems we did not install.

What to bring to the first conversation

  • The lease, or at least the make-good, alterations and assignment clauses.
  • Who is on the retail electricity account, and how the site is metered.
  • Remaining term, and any options to renew.
  • Roof age, and any membrane or sheet warranty still running.
  • Twelve months of interval data if you can get it from your retailer. A quarterly bill total hides the shape of the load, and the shape is the design.

If you are a landlord rather than a tenant, the same list works. You are simply answering from the other side of it.

Government, council and institutional work follows a different path again: see energy performance contracting. For an existing array that is already on a leased roof and underperforming, start with maintenance and O&M. Tender documents are issued by a person within one business day of a request. They cover the capability statement, licence copies, accreditation evidence and certificates of currency.