Solar and battery installation in Dural
Dural is the one suburb where almost nothing can be assumed from the address. The council changes across Old Northern Road, and so does the electricity network, which means the export rules change with it.
Solar in Dural: the suburb where you cannot assume anything
Dural accounts for four completed Crown Solar installations, and one of them carries a recorded system size of 38.7kW. By a wide margin the largest system on this site. That figure is not a residential norm and this page will not present it as one. It is what happens on acreage with sheds, pumps and three-phase supply.
But the genuinely unusual thing about Dural is administrative, and it costs people money. Two of the three facts that normally follow from a suburb name do not follow here.
The council changes. Dural is divided between Hornsby Shire and The Hills Shire, broadly along Old Northern Road, with Hornsby to the east and The Hills to the west. Each council publishes its own bushfire-prone land mapping and its own development controls, so the correct answer for your lot comes from the correct council.
The electricity network changes too. The Dural jobs on Crown Solar's record carry meter identifiers with both an Ausgrid prefix and an Endeavour Energy prefix. That is not a data error; Dural sits on the boundary between two distribution networks. And because Ausgrid and Endeavour have entirely different export arrangements and entirely different timetables, two Dural neighbours can be given correct and completely different advice.
So the first job on a Dural quote is not the roof. It is establishing which network and which council the property is actually in. An installer who answers "Dural is Endeavour" or "Dural is The Hills" without looking has guessed, and there is a fifty per cent chance they are wrong.
Your grid connection: find out which one first
Your National Metering Identifier, which appears on your electricity bill and in your meter box, settles the question. It is not a matter of opinion and it takes one look. Whoever quotes you should check it before describing any export limit.
If the property is on Endeavour Energy
Endeavour has published two rollout stages for flexible exports, staged by postcode. The first commenced on 2 November 2026 and the second commences on 30 November 2026. Postcode 2158 appears in neither, which places it in the February 2027 phase of Endeavour's availability plan. Endeavour has published the month, not a date within it, so this page gives the month and nothing more precise. Treat any quote naming a specific February day for 2158 as unsourced.
When it applies, a flexible export connection allows up to 10kW per phase to be exported most of the time, reduced only when local grid conditions require it. The opt-out is Endeavour's Fixed Exports plan with a maximum export of 1.5kW. Until the rollout arrives, an application submitted and approved under the existing process carries a fixed export limit. Endeavour requires an address in its network area, an active internet connection by Wi-Fi or cable, net export metering configured for the solar inverter, and a CSIP-AUS approved inverter listed on the Clean Energy Council website.
If the property is on Ausgrid
From 23 November 2026 Ausgrid launches the first release of Ausgrid Connect for embedded generation applications, a new system with a new sign-in. On exports, Ausgrid offers a choice between a flexible export connection, which permits the maximum export, and a fixed export connection, which is constantly lower. Ausgrid does not publish the kilowatt figures on its connection page and this site will not guess at them. Ask for the limits that will apply at your address in writing as part of the quote.
Ausgrid also says plainly to always use a Solar Accreditation Australia (SAA) accredited installer, and that you should receive a Certificate of Compliance for Electrical Work after installation. Keep it. You will want it when you sell.
The NSW-wide requirements, which apply either way
From November 2026, new requirements are being phased in for all new and upgrading solar systems in NSW: a smart solar inverter capable of responding to an emergency backstop, registration in the NSW Government's CER Installer Portal, and an internet connection communicating securely with network systems. The emergency backstop is a last-resort measure for rare conditions when more rooftop solar is flowing into the grid than can be used. It changes what equipment is acceptable, not whether solar is worth installing.
On a large acreage system the internet requirement is a real piece of work. Where the switchboard is in a shed or on a pole a long way from the house, the inverter position may have no usable Wi-Fi at all, and a cable run or dedicated link becomes part of the job rather than an afterthought.
Designing for Dural acreage
The best roof is often not the house. A machinery shed, barn, stable or large garage frequently offers a bigger, simpler, better-oriented and completely unshaded plane. The trade-off is distance.
Voltage drop over distance is the cost nobody quotes for. Running a long way from an outbuilding back to the main switchboard means heavier cable, and heavier cable costs money. Undersize it and you lose output permanently and quietly. The cable run is calculated rather than estimated, and on a large block it can decide which roof gets used even when the shed has the better aspect.
Pumps change the load profile completely. Many Dural properties are unsewered and on tank or bore water, which means a pressure pump, and some have irrigation as well. A pump is a large intermittent load with a high starting current, and when it runs decides whether that energy comes from the array, the battery or the grid. It affects both battery sizing and inverter selection, and whether a battery can start it on backup is a specification question rather than a hope.
Three-phase supply is common and useful. Beyond the per-phase export allowance on Endeavour, three-phase changes which inverters are suitable and how a battery is configured for backup. Whether backup covers the whole property or a selected circuit deserves a deliberate decision here, because during an outage water usually matters more than lighting.
Shade comes from tall remnant trees, not from neighbours. Dural's canopy includes substantial mature eucalypts, and a single tall tree can shade a roof face for hours in winter. Shading is assessed for the winter sun path, when the sun is roughly thirty degrees lower, rather than from how the roof looks in the middle of a summer day.
Approval thresholds bite at this scale. Streamlined pathways apply up to certain inverter capacity levels, and above those a proposal can require a more detailed network assessment, which takes longer and may carry a cost. On a 30kW-plus system that timeline belongs in the plan from the start.
Bushfire: a lot-by-lot question with real consequences
Much of Dural and the surrounding valleys adjoin bushland and national park, and Hornsby Shire states that about 40 per cent of properties in the shire are in bush fire prone areas. The Hills Shire publishes its own mapping separately.
The status is set lot by lot rather than by suburb, so this is a thing to check rather than assume, from the correct council's map and the NSW Planning Portal property tool. Where a lot is mapped, it bears on where ground-level equipment can be sited, how cable is routed, and in some cases which approval pathway the work takes. It does not prevent a solar installation; it means the position of the inverter, battery and isolators is a deliberate decision rather than a default, and that any additional requirements are known before the quote is signed rather than after.
Storage on an acreage property
A battery is sized against evening and overnight consumption, not against the size of the array. On acreage that figure is higher and lumpier than in a suburb, because pumps, sheds, workshops and sometimes a second dwelling sit on the same meter.
The useful exercise is to work out what actually runs after dark and what you want to keep running if the supply drops, which on a rural block is frequently water before anything else. A smaller battery that is cycled every day still beats a large one that is rarely emptied, and oversizing storage is an expensive way to feel prepared.
Where a battery is being retrofitted, the inverter decides most of the cost. Adding storage is treated as an upgrade, which brings the connection under current requirements, so an inverter that is not CSIP-AUS approved turns an addition into a replacement plus an addition.
The federal battery discount is applied by the installer at the point of sale through the small-scale certificate mechanism, and the rate steps down over time. Crown Solar sets out the figure applying to your quote in writing rather than publishing one here.
Approvals: two councils, one suburb
For most rooftop installations the council is not the approval authority, because most rooftop solar in NSW is exempt development under State Environmental Planning Policy (Transport and Infrastructure) 2021 and requires no development application. That holds in both Hornsby Shire and The Hills Shire.
The exemption is conditional, with a capacity limit among the conditions, so on rural-zoned land a large shed-mounted or ground-mounted array can fall outside it and need development consent. The exemption also carries limits on land with heritage significance, and both councils maintain heritage schedules. Since the controls, the mapping and the lodgement all sit with whichever council the lot is in, establishing that first is not a formality. Crown Solar checks the lot before the quote is finalised.
What the installation actually involves
Network and council established first, from the meter identifier and the lot, because the export rules and the approval pathway both follow from them.
Site assessment across the whole property. Every candidate roof, not only the house: orientation, pitch, structure and winter shading on each.
Supply and switchboard. Single or three phase, switchboard location and condition, and the distance from each candidate roof to it.
Load profile including pumps. What runs, when, and what must keep running in an outage.
Bushfire mapping and cable routing. Checked against the lot on the correct council's map.
Design and quote. Cable run calculations, battery sizing, and the export position for the network the property is actually on.
Connection application to Ausgrid or Endeavour as applicable. Nothing is installed before approval.
Commissioning, metering and handover paperwork.
Find out what your roof can carry
The design starts with your roof and your own bill, not with a number over the phone.
Crown Solar does not quote off a template or over the phone. Every design is built on your own site data.
Common questions about solar in Dural
My neighbour was told something different. Who is wrong?
Possibly neither of you. If your properties are on opposite sides of the network boundary, different export arrangements and different timetables genuinely apply. Compare meter identifiers before assuming anyone has made a mistake.
Should the array go on the ground?
It is possible on acreage and occasionally the best answer, but it is a different approval pathway and a different cost structure: footings, framing, cable and stock protection. On rural-zoned land it can require development consent, and on bushfire-mapped land the siting is constrained. Worth pricing against a shed-mounted option rather than assumed either way.
Is a 30kW-plus system reasonable?
For a house alone, no. For a property with sheds, pumps, a workshop and sometimes a second dwelling on the same supply, it can be exactly right. The size follows the load and the supply arrangement, which is why two Dural quotes can legitimately differ by a factor of three.
What Crown Solar installs here
The panel Crown Solar is currently installing is Trina Solar, fitted as the high-wattage Vertex range. On the local record Jinko Solar and Canadian Solar panels appear on the Dural roofs on file, from the earlier years of this work. That distinction is worth having if you are comparing a quote today against what a neighbour had fitted: the panel on your quote is the current one, not the one on their roof. Crown Solar also installs JA Solar, AE Solar and LONGi panels.
Inverters and storage
GoodWe accounts for the recorded inverters on the Dural jobs.
Crown Solar also installs FoxESS, Sungrow, Fronius and SAJ inverters, and Tesla Powerwall, Sigenergy and AlphaESS batteries. On a large three-phase property the choice is narrowed first by capacity and by what you need backed up, and only then by preference, so it is made with the design rather than before it. Those are the current range, available on any job, not a list of what has been fitted locally.
Talk to Crown Solar about your Dural property
Crown Solar is a NSW electrical contractor, licence 378172C, and a New Energy Tech Approved Seller. The office is at 3B/4 Louise Avenue, Ingleburn, and is open Mon–Fri 9am–5pm.
For a quote on a Dural address, call 1800 38 50 38, email info@crownsolar.com.au, or use the contact form. For a larger property or a commercial shed roof, commercial@crownsolar.com.au reaches the commercial team.
Get it in writing for your Dural address
Send the address and your last four quarterly bills. You get a system size, the roof faces it sits on, the export arrangement, and the price. All in writing.
Prefer email? info@crownsolar.com.au. One question to start with: what is your place using in a quarter?