Melonba is the single busiest suburb on Crown Solar's install record. Here is what installing on a 2765 roof actually involves, from the Endeavour Energy connection through to the Blacktown City Council approval path.

Solar in Melonba: what the install record actually shows

Melonba is a new suburb. It was gazetted out of the old Riverstone and Marsden Park land release and most of its housing stock has gone up inside the last few years, which makes it unusual among the places Crown Solar works: almost every roof is a modern roof, almost every switchboard is a modern switchboard, and almost nobody is retrofitting around forty-year-old wiring.

It is also the busiest single suburb on Crown Solar's record. Twenty-nine completed installations sit against Melonba, more than any other suburb in the business. Of the Melonba jobs where a system size was recorded, the average is 12.6kW and the largest is 15kW. The mix is the more telling number: twenty of those jobs are solar paired with a battery or a battery added to existing panels, and only one is panels on their own.

That ratio is not an accident of sales. It is what happens in a suburb of new, all-electric or near all-electric homes with ducted air conditioning, where the evening load is large enough that exporting the middle of the day and buying it back at night makes little sense. If you are in Melonba and weighing panels against panels-plus-storage, your neighbours have mostly already had that argument.

29completed Crown Solar installations in Melonba
30 Nov 2026the date flexible exports reach postcode 2765

Your grid connection: Endeavour Energy, postcode 2765

Melonba sits in the Endeavour Energy distribution area. This matters more than most homeowners expect, because your distributor, not your retailer, and not your installer, decides how much power your system is allowed to push back into the street. Two homes with identical panels on identical roofs can have very different export limits if they sit on different networks.

Where 2765 sits in Endeavour's rollout

Endeavour stages flexible exports by postcode, not by council.

  1. Stage 1, commenced 2 November 2026 Postcodes in and around the Campbelltown, Camden, Picton and Liverpool regions.
  2. Stage 2, commences 30 November 2026 A further set of postcodes across Endeavour's area. Postcode 2765 is in this stage
  3. Phase 3, February 2027 Endeavour has published the month and not a day within it. Its rollout map gives the date for a specific address.

What you may export, by connection type

Endeavour Energy, kilowatts per phase.

Export allowance by connection type A flexible export connection allows up to 10kW per phase most of the time. The Fixed Exports opt-out allows a maximum of 1.5kW. Flexible export 10kW Fixed export 1.5kW
A flexible export connection allows up to 10kW per phase, most of the time. The network reduces that only when local grid conditions require it. The Fixed Exports opt-out allows a maximum of 1.5kW. Both carry the same connection requirements.

Flexible exports arrive in 2765 on 30 November 2026

Endeavour Energy is moving its customers from fixed export limits to flexible exports, and the rollout is being done by postcode in stages. Postcode 2765 is in the second stage, which commences on 30 November 2026.

The practical effect is a larger export allowance. Endeavour states that a flexible export connection allows customers to export up to 10kW per phase, most of the time, with the limit turned down only when local grid conditions require it. From November 2026, flexible exports become the default connection option for eligible new and upgraded solar systems, and solar retailers offer it as part of the standard connection process.

There is an opt-out, and it is worth understanding before you take it. If you do not want a flexible connection you can choose Endeavour's Fixed Exports plan, which allows a maximum export of 1.5kW. The fixed plan carries the same connection requirements, including a compatible inverter and an active internet connection, so opting out does not simplify the installation. It simply caps what you can send to the grid at a far lower figure.

What your system needs in order to qualify

Endeavour lists four requirements for taking part in flexible exports. You need to be in the Endeavour Energy network area. You need an active internet connection, by Wi-Fi or cable. You need net export metering configured for your solar inverter. And you need a solar system with a CSIP-AUS approved inverter listed on the Clean Energy Council website.

That last requirement is the one that catches people adding a battery to an older system. If the inverter already on your roof is not CSIP-AUS approved, the upgrade may mean replacing it, and that cost belongs in the quote from the beginning rather than appearing halfway through the job. Crown Solar checks the existing equipment at the site assessment for exactly this reason.

The NSW CER Installer Portal and the emergency backstop

Alongside flexible exports, the NSW CER Installer Portal is becoming mandatory for all new and upgraded consumer energy resource systems. The portal exists to ensure new and upgraded rooftop solar is emergency backstop enabled and able to communicate over the internet with network utility servers. It is being introduced across NSW in stages, based on postcode, on the same schedule as the export changes.

The emergency backstop mechanism is a protection for the grid as a whole. If far more solar is being exported than the network can absorb, the backstop allows exports to be curtailed. Endeavour describes it as a last resort, expected to be used only rarely and for short periods. It is not a reason to avoid solar. It is a reason to make sure the system you buy is specified to work within the rules that apply to your postcode, because a system that cannot comply is a system that cannot be connected.

What Melonba homes mean for system design

The housing stock here shapes the design work more than the weather does. Melonba lots are typically narrow, the houses are close together, and roof planes are broken up by hips, valleys and the odd second storey. A large array on a Melonba roof is often not one clean rectangle of panels; it is two or three smaller groups on different orientations, which is a design question about string layout and inverter selection rather than simply a question of how many panels fit.

Two consequences follow. First, panel-level performance matters more where parts of an array sit on different faces, so the inverter and optimiser choice is not interchangeable between quotes. Second, the headline kilowatt figure on two quotes can be identical while the expected output is not, because one design has put panels on a face the other avoided. When you compare quotes for a Melonba roof, compare the layout drawing, not just the system size.

New homes also tend to arrive with a modern switchboard and adequate main switch capacity, which removes a common retrofit cost. What they frequently do not have is spare space on the board, so a battery installation may still require board work.

Batteries in Melonba

Given that twenty of twenty-nine Melonba jobs involve storage, battery sizing is the real conversation in this suburb. The federal battery discount is delivered through the same small-scale certificate mechanism as the panel discount, applied by the installer at the point of sale rather than claimed back later, and the rate steps down over time. Crown Solar will set out the figure that applies to your quote in writing rather than quoting a number here, because the rate changes and a number published on a web page ages badly.

A wall-mounted residential home battery beside a switchboard
Illustrative. Capacity is sized against evening and overnight use, not against the size of the array.

What is worth saying plainly is that a battery is sized against your evening and overnight consumption, not against your roof. A larger array does not automatically justify a larger battery, and oversizing storage is one of the more expensive mistakes available in this market. The bill data for the last twelve months answers the question better than any rule of thumb.

On panels the Melonba record is led by Jinko Solar, on seven of the roofs on file. Risen follows with three and JA Solar with two, and single roofs carry AE Solar and Trina Solar. Those are what was fitted at the time rather than what a quote names today.

On equipment, FoxESS is by a distance the most installed inverter and battery brand on Melonba roofs. It appears on more local jobs than every other brand combined, with GoodWe second. That is worth knowing for a practical reason rather than as a boast: in a suburb where so many homes run the same hardware, a crew that works on it constantly is a crew that diagnoses a fault quickly. Crown Solar also installs Sungrow, Fronius, GoodWe and SAJ inverters, and Tesla Powerwall, Sigenergy and AlphaESS batteries. Those are the current range, available on any job, not a list of what has been fitted locally.

Approvals: Blacktown City Council and the NSW planning rules

Melonba falls within Blacktown City Council. For the great majority of rooftop installations, the council is not the approval body at all: most rooftop solar in NSW is exempt development under State Environmental Planning Policy (Transport and Infrastructure) 2021, which means no development application is required.

That exemption is conditional and the conditions are strict. Among them are a capacity limit and a restriction on panels facing the street. If a proposal does not comply with every requirement, it is not exempt development and development consent is needed. Site overlays. Bushfire-prone land being the one most often relevant on the growth-corridor fringe. Are a separate check against the council's own mapping. Crown Solar confirms your specific lot against these before the quote is finalised, rather than discovering it at installation.

What the installation actually involves

The sequence for a Melonba job runs roughly as follows.

Rooftop solar panels on a home in New South Wales
Illustrative. The usable north and west area is normally smaller than the roof looks from the street.
  1. Site assessment. Roof condition, orientation and shading, switchboard and main switch capacity, meter position, and the existing inverter if you already have one.

  2. Design and quote. Panel layout by roof face, inverter and battery selection, and the export limit that applies to your connection.

  3. Connection application to Endeavour Energy. Work does not start before the approval comes back. An installer who begins before the Permission To Connect letter has arrived is taking a risk with your installation, not theirs.

  4. Installation. Most residential jobs in this suburb are a single day; a larger array with a battery and switchboard work can run to two.

  5. Commissioning, metering and paperwork. Including the certificate paperwork and the handover documents you will need if you sell the house.

Find out what your roof can carry

The design starts with your roof and your own bill, not with a number over the phone.

Crown Solar does not quote off a template or over the phone. Every design is built on your own site data.

Common questions about solar in Melonba

Is my roof too new to have solar fitted?

No. A new roof is the easiest case. If your home is still inside its builder's warranty period it is worth checking whether roof penetrations affect that warranty, which is a question for the builder rather than the installer, and one worth asking before the install rather than after.

Can I add a battery later rather than now?

Yes, and plenty of people do. The thing to settle at the time of the solar installation is whether the inverter you are buying is battery-ready and CSIP-AUS approved, because replacing a two-year-old inverter to add storage is the avoidable version of this cost.

Does Crown Solar actually work in Melonba, or just advertise there?

Twenty-nine completed installations in this suburb, which is more than in any other single suburb in the business. The crews that install here do so regularly.

Talk to Crown Solar about your Melonba roof

Crown Solar is a NSW electrical contractor, licence 378172C, and a New Energy Tech Approved Seller. The office is at 3B/4 Louise Avenue, Ingleburn, about forty minutes from Melonba, and is open Mon–Fri 9am–5pm.

To get a quote for a Melonba address, call 1800 38 50 38, email info@crownsolar.com.au, or use the contact form. If you want to see what has already been installed nearby, the projects page lists completed work by suburb.

Get it in writing for your Melonba address

Send the address and your last four quarterly bills. You get a system size, the roof faces it sits on, the export arrangement, and the price. All in writing.

Prefer email? info@crownsolar.com.au. One question to start with: what is your place using in a quarter?

Want this checked against your own roof and bill?

Get a free, no-obligation quote