Solar and battery installation in Padstow

Both recorded Padstow systems are large and neither has a battery. At 15.8kW and 22.0kW that points to three-phase supply, and it makes the Ausgrid export limit the number that matters most.

Solar in Padstow: large arrays, no storage, and an unpublished export limit

Padstow accounts for three completed Crown Solar installations. Where a system size is recorded, the two figures on file are 15.8kW and 22.0kW, and neither has a battery. Two records are not a local figure and this page does not present them as one, but both facts point the same way and are worth following.

Systems that size are not ordinary single-phase residential installations. They indicate three-phase supply and a substantial load, which in Padstow is unsurprising, because the suburb pairs established housing with one of the larger industrial and factory-unit areas in the Canterbury-Bankstown district.

And when an array is that large, one number in the quote matters more than any other. Padstow is on Ausgrid, and Ausgrid does not publish its export figures.

3completed Crown Solar installations in Padstow
Ausgridnot an Endeavour postcode, so the November export dates do not apply

Your grid connection: Ausgrid, postcode 2211

Padstow is on the Ausgrid network, not Endeavour Energy. The Padstow jobs on Crown Solar's record that carry a meter identifier show Ausgrid network prefixes. The flexible export dates being discussed across south-western Sydney, 2 November and 30 November 2026, are Endeavour dates and are not Padstow's. A quote citing either has been prepared against the wrong network.

Ausgrid approves your connection and sets your export arrangement. Your electricity retailer does neither.

What is actually happening on Ausgrid

From 23 November 2026 Ausgrid launches the first release of Ausgrid Connect for embedded generation applications, a new system with a new sign-in. Other application types continue through the existing process for the time being.

On exports, Ausgrid offers a choice between a flexible export connection, which permits the maximum export, and a fixed export connection, which is constantly lower. Ausgrid does not publish the kilowatt figures on its connection page and this site will not guess at them. Ask for the limits that will apply at your address in writing as part of the quote.

On a 6kW system that request is good practice. On a 22kW system it is the difference between a sound investment and an expensive one, because every kilowatt you can neither use nor export is a kilowatt you paid for and will never see again. At this scale the export arrangement is the commercial heart of the quote, and an installer who cannot tell you what it will be has not finished the work.

The NSW-wide requirements, which do apply here

From November 2026, new requirements are being phased in for all new and upgrading solar systems in NSW. A smart solar inverter capable of responding to an emergency backstop, registration in the NSW Government's CER Installer Portal, and an internet connection communicating securely with network systems.

Ausgrid also says plainly to always use a Solar Accreditation Australia (SAA) accredited installer, and that you should receive a Certificate of Compliance for Electrical Work after installation. Keep it. You will want it when you sell the house.

The emergency backstop mechanism is a last-resort measure for rare conditions when more rooftop solar is flowing into the grid than can be used, in which the network signals eligible systems to reduce exports briefly. It changes what equipment is acceptable, not whether solar is worth installing.

Large systems: three-phase, thresholds and what justifies the size

Above roughly 10kW of inverter capacity, three-phase supply is usually the practical requirement. It also changes which inverters are suitable and how a battery would be configured for backup, so it is a design input rather than a detail, and whether your property has it is established before a design is drawn.

Approval pathways have thresholds. Streamlined processes apply up to certain inverter capacity levels, and above those a proposal can require a more detailed network assessment, which takes longer and may carry a cost. At 22kW that belongs in the plan from the start.

Sizing at this scale follows consumption, not roof area. A large array makes sense where the load is genuinely large: electric hot water, ducted air conditioning, a pool, one or two electric vehicles, a workshop, or people at home through the day. If the consumption is not there, the same money spent on a smaller array plus storage will usually do more.

Oversizing panels relative to the inverter is a real technique with a real limit. It raises morning and winter output, and past the allowed ratio it does nothing at all. That ratio is specific to the inverter proposed, and it is worth asking how close the design sits to it.

What Padstow properties mean for system design

Switchboard capacity, not just condition. For a large system and any future battery, the question is whether the board has the capacity, the protective devices and the physical space for what is being added. On established housing it frequently does not, and on a three-phase installation there is more protection to fit. It is assessed and priced before you sign rather than raised on installation day.

Rooftop solar panels on a home in New South Wales
Illustrative. The usable north and west area is normally smaller than the roof looks from the street.

Asbestos in a pre-1990 house is a constraint to plan for. Bonded asbestos cement sheeting was used in Australian housing until the late 1980s, including eaves linings and meter box backing boards. Where it is present it changes how cable is run and who may do that work. The eaves and meter box are inspected during the assessment rather than discovered with a drill.

Usable faces, not total roof area. A large array needs usable roof to sit on, and on a conventional house the north and west faces that can carry panels are routinely about half what the roof looks like from the street. Where the roof cannot carry the figure being quoted, something has to give, and it should not be the orientation.

Mixed roof ages and materials. Tile and sheet metal both appear, sometimes on one house where an addition has been built. Older tiles are brittle, so the mounting method and the number of tiles lifted matter, and where a roof is close to needing replacement, doing the roof first is cheaper than paying to remove and refit an array later.

Winter shading from mature planting. A tree that casts nothing on the roof in January can cover a significant part of an array at nine in the morning in June, because the sun is roughly thirty degrees lower. Shading is assessed for the winter sun path rather than from how the roof looks on the day of the visit.

For lots toward the Georges River side of the suburb, the flood position is worth checking from council mapping, because it bears on where ground-level equipment can safely be sited.

Storage, and why it may matter more here than more panels

A battery is sized against evening and overnight consumption, not against the size of the array. On a property with a 20kW-plus array that distinction is easy to lose: a large array does not imply a large battery, it implies a large daytime surplus, and what the battery has to cover is the hours after sunset.

Where the export limit is constrained, storage changes the arithmetic more than extra panels do, because energy you store and use yourself is worth the retail rate you avoid paying rather than a feed-in rate you do not control. On an Ausgrid connection where the limit is not published until you ask, that is the central reason to get the figure in writing before deciding between a bigger array and a battery.

A smaller battery that is actually cycled every day beats a large one that is rarely emptied. Where a battery is being retrofitted, the inverter decides most of the cost: adding storage is treated as an upgrade, which brings the connection under current requirements, so an inverter that cannot respond to the emergency backstop turns an addition into a replacement plus an addition.

The federal battery discount is applied by the installer at the point of sale through the small-scale certificate mechanism, and the rate steps down over time. Crown Solar sets out the figure applying to your quote in writing rather than publishing one here.

Approvals: City of Canterbury-Bankstown and the NSW planning rules

Padstow falls within the City of Canterbury-Bankstown. For most rooftop installations the council is not the approval authority, because most rooftop solar in NSW is exempt development under State Environmental Planning Policy (Transport and Infrastructure) 2021 and requires no development application.

The exemption is conditional, and at the sizes recorded locally the condition that matters most is the capacity limit: a system well above ordinary residential scale can fall outside the exemption and require development consent, which is a different timeline and cost. The exemption also carries a restriction on panels facing the street and limits on land with heritage significance. Crown Solar checks the lot and the proposal before the quote is finalised.

What the installation actually involves

  1. Supply arrangement first. Single or three phase, and switchboard capacity and available space, because on a large system they decide what is possible.

  2. Twelve months of consumption. Which justifies the size, or does not.

  3. Site assessment. Roof material, pitch, age and condition, usable faces, winter shading, and the inverter position with its internet coverage.

  4. Approval pathway. Whether the proposal stays inside exempt development, and which Ausgrid assessment the inverter capacity triggers.

  5. Design and quote. Layout by roof face, sizing against your own consumption, and the Ausgrid export arrangement in writing.

  6. Connection application to Ausgrid, submitted by your installer.

  7. Commissioning, metering and handover paperwork, including the Certificate of Compliance for Electrical Work.

Find out what your roof can carry

The design starts with your roof and your own bill, not with a number over the phone.

Crown Solar does not quote off a template or over the phone. Every design is built on your own site data.

Common questions about solar in Padstow

Should I wait for the November network changes?

No, and the question partly rests on a mix-up: the staged November dates belong to Endeavour Energy, which is not your network. What applies from November is the NSW-wide equipment and registration requirement, satisfied by using compliant equipment now rather than by waiting.

Is a 22kW system sensible for a house?

It is where the consumption and the supply support it, and poor value where they do not. The test is your own twelve months of data and your export limit, not the roof area available.

What should I ask every installer who quotes me?

Which network they have quoted against, and whether they say Ausgrid. What export limit will actually apply at your address, in writing. Whether the supply is single or three phase and whether any upgrade is included. And whether the switchboard has been inspected and priced or merely assumed.

What Crown Solar installs here

The panel Crown Solar is currently installing is Trina Solar, fitted as the high-wattage Vertex range. Crown Solar also installs JA Solar, Jinko Solar, AE Solar and LONGi panels. On the local record JA Solar and Jinko Solar panels appear on the Padstow roofs on file, from the earlier years of this work. That distinction is worth having if you are comparing a quote today against what a neighbour had fitted: the panel on your quote is the current one, not the one on their roof.

Inverters and storage

GoodWe appears on the recorded Padstow inverters. No battery is recorded on either of the local systems, so the Padstow record is solar rather than storage.

Crown Solar also installs FoxESS, Sungrow, Fronius and SAJ inverters, and Tesla Powerwall, Sigenergy and AlphaESS batteries. On a large three-phase system the choice is narrowed first by capacity and backup requirements and only then by preference, so it is made with the design rather than before it. Those are the current range, available on any job, not a list of what has been fitted locally.

Talk to Crown Solar about your Padstow property

Crown Solar is a NSW electrical contractor, licence 378172C, and a New Energy Tech Approved Seller. The office is at 3B/4 Louise Avenue, Ingleburn, and is open Mon–Fri 9am–5pm.

For a house at a Padstow address, call 1800 38 50 38, email info@crownsolar.com.au, or use the contact form. For a factory unit or warehouse roof in the industrial area, commercial@crownsolar.com.au reaches the commercial team.

Get it in writing for your Padstow address

Send the address and your last four quarterly bills. You get a system size, the roof faces it sits on, the export arrangement, and the price. All in writing.

Prefer email? info@crownsolar.com.au. One question to start with: what is your place using in a quarter?

Want this checked against your own roof and bill?