Solar and battery installation in Constitution Hill

Both recorded Constitution Hill systems are large. 14.9kW and 20.2kW, and systems that size need three-phase supply. This page explains what that is and what it changes.

Solar in Constitution Hill: both local systems are large, which means three phases

Constitution Hill accounts for three completed Crown Solar installations. Two carry a recorded system size, at 14.9kW and 20.2kW, and neither has a battery. Two records are not a local figure and this page does not present them as one.

But both sit above the point where a single-phase house runs out of road. So the most useful thing this page can do is explain the thing every other page on this site mentions in a sentence and moves on from: three-phase supply. What it is, how to tell whether you have it, and the four things it changes.

Constitution Hill sits in the Cumberland City Council area on postcode 2145, which it shares with Greystanes and several neighbouring suburbs.

3completed Crown Solar installations in Constitution Hill
February 2027Endeavour's published phase for postcode 2145, month only

Single-phase and three-phase, plainly

Most Australian houses have a single-phase connection: one live conductor bringing power in from the street. Larger or newer houses often have three-phase: three live conductors, each carrying its own supply. It is not a quality difference. It is a capacity difference, and for solar it is the single biggest constraint on what is possible.

How to tell which you have, in thirty seconds. Open the meter box and look at the main switch. A single-phase main switch is one wide device with one toggle. A three-phase main switch is three poles ganged together so they move as one, and the meter will usually show three sets of incoming connections. If you are unsure, your installer should confirm it rather than guess, because everything in the design follows from it.

The four things three phases change

1. The export allowance multiplies. A flexible export connection allows up to 10kW per phase to be exported most of the time. Per phase. So the total permitted export on three phases is substantially larger than on one, and that is the main reason a 20kW array can be a sensible proposition on a residential block at all.

2. The inverter choice widens, and narrows. Three-phase inverters are a different product range from single-phase ones. Some well-regarded single-phase models are simply not available in a three-phase version, so the shortlist changes. A three-phase inverter also balances output across the phases, which matters for the next point.

3. Backup gets more complicated. On single-phase, backup is one decision: whole-home, a nominated essential circuit, or none. On three-phase you additionally have to decide whether all three phases are backed up or only one, and which circuits sit on which phase. A system that backs up one phase will not carry a load wired to another. This is a specification question and it should be written down.

4. The approval threshold moves. Streamlined pathways apply up to certain inverter capacity levels, and above those Endeavour can require a more detailed network assessment, which takes longer and may carry a cost. Three-phase supply generally allows a larger total before that happens, but "generally" is not "always", and at the size of the larger local record it is worth confirming rather than assuming.

And if you have single-phase but want a large system? An upgrade to three-phase is sometimes possible. It is a network job with its own application, cost and timeline, not something the installer does on the day. If a quote depends on an upgrade, it belongs in the quote, priced and scheduled. A quote that assumes it silently has moved a significant cost and delay onto you.

Your grid connection: Endeavour Energy, postcode 2145

Constitution Hill is in the Endeavour Energy distribution area. Endeavour approves the connection and sets the export limit. Your electricity retailer does neither.

Where 2145 sits in Endeavour's rollout

Endeavour stages flexible exports by postcode, not by council.

  1. Stage 1, commenced 2 November 2026 Postcodes in and around the Campbelltown, Camden, Picton and Liverpool regions.
  2. Stage 2, commences 30 November 2026 A further set of postcodes across Endeavour's area.
  3. Phase 3, February 2027 Endeavour has published the month and not a day within it. Its rollout map gives the date for a specific address. Postcode 2145 is in this stage

What you may export, by connection type

Endeavour Energy, kilowatts per phase.

Export allowance by connection type A flexible export connection allows up to 10kW per phase most of the time. The Fixed Exports opt-out allows a maximum of 1.5kW. Flexible export 10kW Fixed export 1.5kW
A flexible export connection allows up to 10kW per phase, most of the time. The network reduces that only when local grid conditions require it. The Fixed Exports opt-out allows a maximum of 1.5kW. Both carry the same connection requirements.

Flexible exports reach 2145 in the February 2027 phase

Endeavour has published two rollout stages by postcode. The first commenced on 2 November 2026, covering postcodes in and around the Campbelltown, Camden, Picton and Liverpool regions. The second commences on 30 November 2026 and adds a long list of Blue Mountains, Penrith, Hawkesbury and Illawarra postcodes. 2145 appears in neither, which places Constitution Hill in the February 2027 phase of Endeavour's availability plan. Endeavour has published the month, not a date within it, so this page gives the month and nothing more precise. Treat any quote that names a specific February day for 2145 as unsourced.

Until the rollout reaches 2145, an application submitted and approved under the existing process carries a fixed export limit, and that position should appear on your quote in writing. The opt-out once flexible exports arrive is Endeavour's Fixed Exports plan with a maximum export of 1.5kW, which on either of the local system sizes would be a severe restriction rather than a simplification.

What your system has to meet

Endeavour requires an address in its network area, an active internet connection by Wi-Fi or cable, net export metering configured for the solar inverter, and a CSIP-AUS approved inverter listed on the Clean Energy Council website.

The emergency backstop mechanism allows the network to curtail exports when the grid cannot absorb what is being sent into it. Endeavour describes it as a last resort, expected to be used rarely and for short periods.

What a large array needs beyond the supply

Usable roof, not roof area. A 20kW array needs somewhere sensible to sit. The north and west faces that can carry panels at a good orientation are routinely about half what the roof looks like from the street, so on a conventional house the roof can be the binding constraint even where the supply is not.

Consumption that justifies it. Electric hot water, ducted air conditioning, a pool, one or two electric vehicles, a second dwelling on the same meter, or people home through the day. Without them, a large array produces energy nobody is there to use, and until February 2027 the export limit here caps what you can do with the surplus.

Switchboard capacity and space. Three-phase protection takes more room than single-phase, and on established housing the board frequently has neither the capacity nor the width. It is assessed and priced before you sign rather than raised on installation day.

What Constitution Hill properties mean for system design

Established housing across several decades. Roof material, roof age and switchboard condition have to be established property by property rather than inferred from the street.

Rooftop solar panels on a home in New South Wales
Illustrative. The usable north and west area is normally smaller than the roof looks from the street.

Asbestos in a pre-1990 house is a constraint to plan for. Bonded asbestos cement sheeting was used in Australian housing until the late 1980s, including eaves linings and meter box backing boards, which is exactly where three-phase switchboard work has to happen. Where it is present it changes how the work is done and who may do it, so the meter box and eaves are inspected during the assessment rather than discovered with a drill.

Roof condition decides the sequence. Where a roof is close to needing replacement or significant repair, doing that first and the solar second is cheaper than paying to remove and refit an array later, and on a 20kW array that bill is substantial.

Heat, because this is western Sydney. Panels are rated at a cell temperature of 25°C and output falls as the cell rises above it, and inverters reduce their own output when they overheat. So the inverter position is a design decision: out of direct afternoon sun, with airflow around it, and not boxed into an unventilated cupboard.

Winter shading from mature planting. A tree that casts nothing on the roof in January can cover a significant part of an array at nine in the morning in June, because the sun is roughly thirty degrees lower. Shading is assessed for the winter sun path rather than from how the roof looks on the day of the visit.

Batteries in Constitution Hill

No battery is recorded on the local jobs, so the Constitution Hill record is solar rather than storage.

A wall-mounted residential home battery beside a switchboard
Illustrative. Capacity is sized against evening and overnight use, not against the size of the array.

A battery is sized against evening and overnight consumption, not against the size of the array. On a property with a large array that distinction is easy to lose: a large array implies a large daytime surplus, and what the battery covers is the hours after sunset.

A smaller battery that is actually cycled every day beats a large one that is rarely emptied. Where exports are capped until February 2027, storage changes the arithmetic more than extra panels do, because energy you store and use yourself is worth the retail rate you avoid paying rather than the feed-in rate you do not control.

Where a battery is being retrofitted, the inverter decides most of the cost. Adding storage is treated as an upgrade, which brings the connection under current requirements, so an inverter that is not CSIP-AUS approved turns an addition into a replacement plus an addition, and on three phases the backup configuration question above comes with it.

The federal battery discount is applied by the installer at the point of sale through the small-scale certificate mechanism, and the rate steps down over time. Crown Solar sets out the figure applying to your quote in writing rather than publishing one here.

Approvals: Cumberland City Council and the NSW planning rules

Constitution Hill falls within Cumberland City Council. For most rooftop installations the council is not the approval authority, because most rooftop solar in NSW is exempt development under State Environmental Planning Policy (Transport and Infrastructure) 2021 and requires no development application.

The exemption is conditional, and at the sizes recorded locally the condition that matters most is the capacity limit: a system well above ordinary residential scale can fall outside the exemption and require development consent, which is a different timeline and cost. The exemption also carries a restriction on panels facing the street and limits on land with heritage significance, and the council maintains a heritage schedule. Crown Solar checks the lot and the proposal before the quote is finalised.

What the installation actually involves

  1. Supply arrangement confirmed first. Single or three phase, read from the meter box rather than assumed, because the export allowance, the inverter shortlist, the backup design and the approval threshold all follow from it.

  2. Twelve months of consumption. Which justifies the size, or does not.

  3. Site assessment. Usable roof faces with orientation and pitch, roof condition, winter shading, and the inverter position chosen for temperature as well as cable run.

  4. Switchboard, meter box and eaves. Capacity and width for three-phase protection, and whether pre-1990 sheeting is present.

  5. Approval pathway. Whether the proposal stays inside exempt development, and which Endeavour assessment the inverter capacity triggers.

  6. Design and quote. Layout by roof face, any supply upgrade priced and scheduled rather than assumed, and the export arrangement that applies given the February 2027 phase.

  7. Connection application to Endeavour Energy. Nothing is installed before approval.

  8. Commissioning, metering and handover paperwork.

Find out what your roof can carry

The design starts with your roof and your own bill, not with a number over the phone.

Crown Solar does not quote off a template or over the phone. Every design is built on your own site data.

Common questions about solar in Constitution Hill

Should I wait for February 2027?

Generally not, though on a large array the export limit matters more than it does on a small one, so this is the kind of address where the arithmetic is worth doing properly rather than waved away. What you should insist on is the arrangement being stated in writing on the quote.

Both local systems are 15kW or more. Should mine be?

Only if your supply and your consumption support it. Two records tell you what two households had; they say nothing about your meter box or your bills.

What should I ask every installer who quotes me?

Whether the supply is single or three phase and how they established it, whether any upgrade is included and priced, what consumption figure the size was derived from, and whether the switchboard has been inspected and priced or merely assumed.

What Crown Solar installs here

The panel Crown Solar is currently installing is Trina Solar, fitted as the high-wattage Vertex range. On the local record Jinko Solar and AE Solar panels appear on the Constitution Hill roofs on file, from the earlier years of this work. That distinction is worth having if you are comparing a quote today against what a neighbour had fitted: the panel on your quote is the current one, not the one on their roof. Crown Solar also installs JA Solar, AE Solar and LONGi panels.

Inverters and storage

GoodWe and Sungrow both appear on the recorded Constitution Hill inverters.

Crown Solar also installs FoxESS, Fronius and SAJ inverters, and Tesla Powerwall, Sigenergy and AlphaESS batteries. On a three-phase system the shortlist is set by capacity and by what you need backed up before preference comes into it. Those are the current range, available on any job, not a list of what has been fitted locally.

Talk to Crown Solar about your Constitution Hill home

Crown Solar is a NSW electrical contractor, licence 378172C, and a New Energy Tech Approved Seller. The office is at 3B/4 Louise Avenue, Ingleburn, and is open Mon–Fri 9am–5pm.

For a quote on a Constitution Hill address, call 1800 38 50 38, email info@crownsolar.com.au, or use the contact form.

Get it in writing for your Constitution Hill address

Send the address and your last four quarterly bills. You get a system size, the roof faces it sits on, the export arrangement, and the price. All in writing.

Prefer email? info@crownsolar.com.au. One question to start with: what is your place using in a quarter?

Want this checked against your own roof and bill?

Get a free, no-obligation quote